Apollo 4 Assembly Guide

Last updated: Nov 13, 2026
Print

Safety

When used correctly, your Langmuir Systems Apollo 4 CNC fiber laser will give you years of safe operation. Like all automated industrial machinery, it has hazards that can cause serious injury or death if the precautions in this section are not followed.

Read this section and the safety labels on the machine before you assemble or use your Apollo 4. Keep this guide with the machine and make sure everyone who operates or services it has read it.

Warning
LASER HAZARDS

Class 4 laser radiation

The Apollo 4 contains a Class 4 fiber laser (max output 1500 W, continuous wave, 1064–1080 nm). The beam is invisible, and direct or scattered radiation can cause permanent blindness and severe burns.

To avoid injury, always adhere to the following precautions:

  • Wear laser eyewear OD 8+ at 1064–1080 nm whenever the laser is on. Ordinary safety glasses give no protection.
  • The enclosure does not block laser radiation. Keep all panels in place and never defeat or remove the safety switches.
  • Turn off the laser source before retrieving parts or servicing the nozzle or lens. Never look into the nozzle.
  • Set up a designated laser area with a warning sign at each entrance, and alert bystanders before cutting.
  • Wear gloves and clothing that cover your skin.
ELECTRICAL HAZARDS
ELECTRICAL HAZARDS

Electric shock and arc flash

The Apollo 4 and its water chiller run on 220–240 VAC. Electric shock or an arc flash can cause severe burns or death, and capacitors hold dangerous voltage after power is off.

To avoid injury, always adhere to the following precautions:

  • Never touch live wires, terminals or components. Never work on energized equipment.
  • Only qualified persons may open the electronics box. Lock out power first.
  • Wait at least 5 minutes after power off, then verify zero voltage before touching components.
  • The chiller has its own 18 A supply. Lock it out separately before servicing.
Fire
FIRE, GAS AND FUMES

Fire

Sparks, molten slag and hot parts from laser cutting can ignite nearby flammable materials. Oxygen assist gas makes materials burn faster.

To avoid injury, always adhere to the following precautions:

  • Never leave the machine unattended while cutting.
  • Keep slag and scrap cleared from the cutting bed and slag tray.
  • Never operate near flammable materials and never cut containers that have held fuel or any flammable substance.
  • Always keep a fire extinguisher near the machine.
  • Aluminum and titanium dust is combustible. Empty the dust collector regularly and use one rated for combustible metal dust.
Gas explosion
FIRE, GAS AND FUMES

Gas explosion

Pressurized oxygen and nitrogen can burst fittings and cause an explosion or fire, resulting in severe burns or death. Nitrogen can displace oxygen and cause suffocation. Oxygen makes oil and grease ignite easily.

To avoid injury, always adhere to the following precautions:

  • Use clean, dry, industrial-grade gas and a regulator rated for each gas. Never exceed O2 80 PSI (5.5 bar) or N2 190 PSI (13.1 bar).
  • Connect each gas only to its labeled inlet, and keep oxygen fittings, lines and hands free of oil and grease.
  • Secure gas cylinders upright with a chain or bracket, away from heat and sparks.
  • Close the supply valves when not in use and bleed the lines before disconnecting anything.
  • Check for leaks with leak-detection solution.
warn-radiations
FIRE, GAS AND FUMES

Hazardous fumes and ventilation

Laser cutting produces fumes and fine metal dust that can cause respiratory irritation, lung damage or metal fume fever. Ventilation is always required.

To avoid injury, always adhere to the following precautions:

  • Run fume extraction for every cut, especially aluminum, stainless steel, brass, copper and galvanized or coated metals.
  • Connect the fume extractor before cutting and vent it outdoors. Never cut with the blower off or the enclosure open.
  • Never cut material coated with paint, oil, grease or solvents, or PVC and other plastics containing chlorine.
  • Check the Safety Data Sheet (SDS) for each material to learn what fumes it produces.
  • If ventilation is poor, use an air-supplied respirator.
MOVING PARTS AND HEAT
MOVING PARTS AND HEAT

Pinch and crush points

The gantry and cutting head move quickly and with force and can start moving without warning whenever the machine is powered.

To avoid injury, always adhere to the following precautions:

  • Keep hands clear of the moving gantry and never reach into its path while the machine is powered.
  • Lock out power before servicing, cleaning or adjusting anything in the cutting area.
  • During assembly, keep hands out of crush points and watch for pinch points at nested flanges, hinges and attachment areas.
  • Use two people to lift and position heavy panels and assemblies.
Hot surfaces
MOVING PARTS AND HEAT

Hot surfaces

Cut parts, slats, slag and surfaces in the cutting area stay hot enough to cause severe burns after cutting.

To avoid injury, always adhere to the following precautions:

  • Always assume metal on or in the machine is hot enough to cause severe burns.
  • Allow parts, slats and surfaces to cool before handling.
  • Never handle hot metal with bare hands. Use heat-resistant gloves or tongs.
Lockout
SERVICE

Lockout / tagout

A machine that is only switched off can be restarted by someone else. Before servicing, cleaning or repairing the Apollo 4, lock out all three energy sources:

E-1 Main electronics

220–240 VAC, 20 A

E-2 Water chiller

220–240 VAC, 18 A

G-1 Assist gas

O2 80 PSI, N2 190 PSI

  1. Tell anyone affected, stop the machine normally and turn off the laser source.
  2. Turn off or unplug E-1 and E-2 and apply your lock and tag to each.
  3. Close the G-1 gas valves, apply a valve lockout and tag, and bleed the lines.
  4. Wait 5 minutes, then verify: the machine will not start, the chiller is off and the gas gauges read 0 PSI.
  5. When work is complete, reinstall all guards and panels, then remove locks and tags.
GENERAL
GENERAL

Do not enter the cutting area

The gantry can move without warning whenever the machine is powered and can crush or trap you. Nitrogen assist gas can collect in the cutting area and cause unconsciousness or death without warning. Oxygen assist gas makes clothing and hair burn easily.

  • Never climb into, crawl into or lean your body inside the cutting area.
  • Retrieve parts and scrap from outside the machine using a hook, tongs or other reach tool.
  • If a part cannot be reached, lock out all energy sources before reaching in.
WARNING

California Prop 65

Risk of cancer and reproductive harm from exposure to lead. See www.P65Warnings.ca.gov.
  • Lead is present in solder used in the machine's electrical components.
  • Wash your hands after handling wiring or electrical components.
SAFETY

Handling the fiber cable and optics

Warning: a kinked fiber cable or a scratched lens cannot be repaired, only replaced.*

Clean work area

Clean work area

Do: Dust-free, dry space; caps on until install.

Don't: Grind or cut metal near open optics.

Yellow fiber cable

Yellow fiber cable

Do: Leave as shipped; support it when moving the head.

Don't: Pull, pinch, step on or unplug it.

Bend radius

Bend radius

Do: Bend the yellow cable in wide curves, 150–200 mm min.¹

Don't: Kink, coil tightly or zip-tie it.

Holding the lens

Holding the lens

Do: Wear nitrile gloves; hold optics by the edges.

Don't: Touch surfaces or set a lens face-down.

Cleaning the lens

Cleaning the lens

Do: Lens tissue, 99% isopropyl, one wipe.

Don't: Breathe on it or wipe with fingers or cloth.

Consumable life

Consumable life

Do: Check the window before each job; replace if cloudy.

Don't: Leave residue; the laser bakes it into the glass.

¹ Yellow fiber cable only. Typical for armored laser cables (15–20× outer diameter). Source: YH Laser, 2026.

* Damage caused by handling outside these guidelines may not be covered under warranty.

0: Unboxing

The Apollo 4 is delivered on a single pallet with all components packed and labeled. The next pages list every box on the pallet and what is inside it. Use them as a reference throughout the assembly.

PALLET CONTENTS

Sub Box 1 and Sub Box 2

SUB BOX 1 Frame

  • Gantry Tube ×1
  • Leg Tube ×2
  • Leg Tube, Mirrored ×2
  • Lower Cross Tube ×2
  • 4X4 Y Axis Rail ×2
  • 4X4 LH Lower Rail ×1
  • 4X4 RH Lower Rail ×1
  • Lead Screw X Axis (1/2") ×1
  • 4X4 Y Axis Lead Screw (1/2") ×2

SUB BOX 2 Long Channels & Supports

  • Upper Brace Assembly×1
  • Upper Gusset Assembly×4
  • Upper Y-axis Support Assembly×2
  • Upper X-axis Support Assembly, Front×1
  • Upper X-axis Support Assembly, Rear×1
  • C Channel Front Door×2
  • Rear Panel Flap×1
  • Y-axis Cable Chain Tray×1
  • X-axis Cable Chain Tray×1
  • Cutting Bed Mount×1
  • Bed Side Mount×2
PALLET CONTENTS

Sub Box 3: Mounts

SUB BOX 3 Mounts

  • Enclosure Mount Assembly ×2
  • Narrow Enclosure Mount Assembly×2
  • Door Switch Plate Assembly ×1
  • Steel Stanchion Plates ×8
  • Leveling Foot Base ×10
  • Source Foot ×1
  • Source Tab ×1
  • Tab A ×1
  • Tab B ×1

SUB BOX 3 Mounts (continued)

  • Chain Tab Weldment×1
  • X-axis Chain Tab×2
  • Chain Tower Weldment×1
  • Slat Mount×4
  • Motor Cover×1
  • Laptop Angle Mount Weldment×1
  • Laptop Stand Weldment×1
  • Tray, Laptop Stand×1
  • Front Mounting×2
PALLET CONTENTS

Sub Boxes 4, 5 and 6

SUB BOX 4 Electronics Box

  • Electronics Box (complete unit) ×1

SUB BOX 5 Gas Box

  • Gas Box (complete unit) ×1

SUB BOX 6 Gantry Components & Hardware

  • CBox 6.1: Z-axis Assembly
  • Carriage Weldment
  • Laser Head Mounting Plate
  • Box 6.2: Hardware Box
  • Box 6.3: Miscellaneous Box
PALLET CONTENTS

Loose items on the pallet

BUNDLE 1 Corners

  • Corner, Narrow Front Assembly ×1
  • Corner, Narrow Rear Assembly×1
  • Corner, Rear Assembly ×1
  • Corner, Front Assembly ×1

BUNDLE 2 Corner Gussets

  • Corner Gusset ×3
  • Corner Gusset Mirrored ×3

SEPARATE Packed Separately

  • Drag Chain ×2
  • Source & Laser Head Box ×1
  • Chiller Box ×1

BUNDLE 3 Chiller Side Right

  • Smooth Side ×1
  • Smooth Side 2 ×1
  • Door ×2

PALLET Bottom of the pallet

  • Slat ×15
  • Slat Holder ×2
  • Smooth Roof Sheet ×2
  • Cutting Bed Front ×1
  • Cutting Bed Extension ×1

BUNDLE 4 Chiller Side Left

  • Bed Side A ×1
  • Bed Side B ×1
  • Cutting Bed Bottom ×1
  • Shielding Plate ×1
  • Rear Panel ×1
  • Rear Bottom Enclosure Panel ×1
  • Front Upper ×1
  • Front Alt Lower ×1
HARDWARE BOX CONTENTS

Screws

SCREWS Bags 101–113

  • 101M2 x 12mm SHCS ×4
  • 102M4 x 10mm Flanged BHCS, Black Oxide ×10
  • 103M4 x 12mm SHCS ×18
  • 104M6 x 14mm BHCS ×68
  • 105M6 x 16mm BHCS ×98
  • 106M6 x 20mm BHCS ×12
  • 107M6 x 20mm SHCS ×4
  • 108M10 x 50mm HHCS ×10
  • 1098-32 x 1/2" SHCS ×6
  • 1108-32 x 3/4" SHCS ×10
  • 11110-32 x 3/8" SHCS ×3
  • 11210-24 x 1/2" SHCS ×14
  • 1131/4"-20 x 1/2" SHCS ×18

SCREWS Bags 114–126

  • 1141/4"-20 x 3/4" SHCS ×14
  • 1151/4"-20 x 7/8" SHCS ×16
  • 1163/8"-16 x 7/8" HHCS ×4
  • 1173/8"-16 x 2-1/2" HHCS ×4
  • 1183/8"-16 x 2-3/4" HHCS ×4
  • 1193/8"-16 x 3" HHCS ×16
  • 1203/8"-16 x 4-1/2" HHCS ×8
  • 121M6 x 10mm SHCS ×3
  • 122M4 x 10mm BHCS ×11
  • 123#10 x 1/2" Self-Drilling Screw ×68
  • 124#12 x 3/4" Self-Drilling Screw ×36
  • 1251/4" x 1" Self-Drilling Screw ×38
  • 126#10-24 x 1/2" Phillips Flat Head Screw ×4
HARDWARE BOX CONTENTS

Washers, nuts and other parts

WASHERS Bags 201–206

  • 201M4 Oversized Washer ×2
  • 202M6 Washer ×112
  • 203#8 Washer ×18
  • 204#10 Washer ×2
  • 2051/4" Washer ×24
  • 2063/8" Washer ×44

OTHER Bags 401–405

  • 401608ZZ Bearing ×3
  • 402Tube Spacer ×24
  • 403Motor Coupler ×4
  • 404X-axis Lead Nut (1) + Y-axis Lead Nut (2) ×3
  • 405EPDM Grommet for rear bottom enclosure panel ×2

NUTS Bags 301–311

  • 301M2 Nylon Locknut ×4
  • 3021/4"-20 Flange Nut ×2
  • 303M4 Flanged Nut ×10
  • 304M4 Flanged Nylok Nut ×18
  • 305M6 Hex Nut ×60
  • 306M10 Hex Nut ×20
  • 3078-32 Nylok Nut ×10
  • 3081/4"-20 Serrated Flange Nut ×18
  • 3093/8"-16 Hex Nut ×36
  • 310M6 Serrated Flange Nut ×10
  • 311#10-24 Lock Nut ×36
TOOLS YOU WILL NEED

Hex keys and wrenches

HEX KEYS Metric

  • 1.5 mmBag 101 (M2 screws)
  • 2.5 mmBags 102, 122 (M4 button heads)
  • 3 mmBag 103 (M4 screws, drag chains)
  • 4 mmBags 104, 105, 106 (M6 button heads)
  • 5 mmBags 107, 121 (M6 cap screws)

HEX KEYS Imperial

  • 5/64″Limit switches
  • 3/32″Bag 403 (motor coupler screws)
  • 9/64″Bags 109, 110 (8-32 screws)
  • 5/32″Bags 111, 112 (#10 screws)
  • 3/16″Bags 113, 114, 115 (1/4″-20 screws)

WRENCHES Wrenches and sockets

  • 4 mmBag 301 (M2 locknuts)
  • 5 mm socketLimit switches
  • 7 mmBags 303, 304 (M4 nuts)
  • 10 mmBags 305, 310 (M6 nuts)
  • 17 mm (×2)Bags 108, 306 (M10), oxygen regulator
  • 11/32″Bag 307 (8-32 nuts)
  • 3/8″Bag 311 (#10-24 nuts)
  • 7/16″Bags 302, 308 (1/4″-20 nuts)
  • 9/16″ (×2)Bags 116–120, 309 (3/8″-16)
  • 1-1/8″, 3/4″, 11/16″Oxygen regulator (26.2)
  • 27, 19, 16 mmNitrogen regulator (26.3)
  • Adjustable, 12″Regulators, if sizes above are missing
TOOLS YOU WILL NEED

Power tools and other equipment

POWER TOOLS Drill and drivers

  • Drill/driverSelf-drilling screws
  • Drill bitGas box holes (24.1)
  • 5/16″ hex driver bitBags 123, 124
  • 3/8″ hex driver bitBag 125
  • #2 Phillips screwdriverBag 126
  • ScrewdriverChiller power plug (25.1)
  • Wire strippersChiller power cord (25.1)
  • Tube cuttersWater and gas tubing

OTHER Setup and safety

  • LevelAll leveling feet
  • Framing squareSquaring the frame (2.4)
  • Nitrile glovesHandling optics
  • Safety glassesDrilling and driving screws
  • Teflon tapeWater and gas fittings
  • Funnel (optional)Filling the chiller
Minimum tool kit
Metric (1.5–5 mm) and imperial (5/64″–3/16″) hex keys, 4–17 mm and 5/16″–9/16″ wrenches and a drill/driver cover every fastener in the hardware box.

1: Install leveling feet

The first step in 4x4 Laser assembly is to install the leveling feet on your leg tubes.

YOU WILL NEED FROM THE HARDWARE BOX Fastener bags 108, 306

1.1 Attach a leveling foot to each leg

Leveling_Feet
Materials
Parts
  • (4) Leg Tube (with and without mounting holes)
  • (4) Leveling Foot Insert
  • (4) Leveling Foot
Hardware
  • (4) Bag 108 M10 HEX HEAD CAP SCREW
  • (8) Bag 306 HEX NUT, 10MM X 1.5mm, ZINC PLATED
Tools
  • Soft Faced Hammer or Mallet
  • (2) 17mm wrenches

Instructions

  1. Insert the Bag 108 M10 Cap Screw into the hole of Leveling Foot. Screw one of the Bag 306 M10 Hex Nuts onto the M10 screw. Fully tighten the nut.
  2. Screw the second Bag 306 M10 Hex Nut onto the screw with approximately 1” gap between it and the first nut.
  3. Tap the Leveling Foot Insert into the bottom end of the Leg Tube. Make sure the insert is fully seated. Note that the leveling insert shipped with your machine will look different than what is shown in the image.
  4. Screw the leveling foot assembly into the Leveling Foot Insert until the nut contacts the leveling insert.
  5. Repeat steps for the other 3 leg assemblies.

2: Frame assembly

Gather all black frame tubes on a large work surface and assemble the frame of the 4x4 Laser.

YOU WILL NEED FROM THE HARDWARE BOX Fastener bags 117, 120, 309, 402

2.1 Identify the LH and RH lower rail tubes

FRAME ASSEMBLY
Materials
Parts
  • (2) Leg Tube (with electronics mounting holes)
  • (2) Leg Tube (without mounting holes)
  • (2) Lower Cross Tube (with Langmuir Systems and 4x4 Laser printing)
  • (1) RH Lower Rail Tube
  • (1) LH Lower Rail Tube
Hardware
  • (8) Bag 120 HEX HEAD CAP SCREW, 3/8-16 X 4.5
  • (4) Bag 117 HEX HEAD CAP SCREW, 3/8-16 X 2.5
  • (12) Bag 309 HEX NUT, 3/8”
  • (20) Bag 402 Tube Spacer
Tools
  • 9/16" Wrench
  • Ratchet with 9/16" Socket

2.2 Lay out the frame tubes

Frame Tubes

2.3 Bolt the frame joints together

Frame Joints

Instructions

  1. On a solid surface, place the LH Lower Rail and RH Lower Rail onto each of the Lower Cross Tubes. Secure them using the hardware shown. Hand tighten only.
  2. Attach each of the leg assemblies using the hardware shown. Hand tighten only.
  3. Pick up the frame assembly and place it on the ground so that it is supported by the legs.

2.4 Square the frame, then tighten the bolts

Square the frame
Materials
Parts
  • Hand Tightened Frame Assembly
Hardware
  • None
Tools
  • Tape Measure
  • 9/16" Wrench
  • Ratchet with 9/16" Socket
  • Soft Faced Hammer or Mallet
  • Protractor, Carpenters square, or machinist square

Instructions

  1. Using a protractor, carpenter’s square, or combination square, make the Lower Rail Tubes perpendicular to the Lower Cross Tubes.
  2. Using a tape measure, measure the distance between the LH and RH Lower Rails at each end (Distance ‘A’ and Distance ‘B’). If the two measurements are different by more than 1/32”, lightly tap on one of the lower rails to equalize the spans.
  3. Carefully tighten the bolts that connect the LH Lower Rail and RH Lower Rail to the Lower Cross Tubes.
  4. Double check that the LH and RH Lower Rails are still parallel within 1/32” after tightening. If they are not, repeat steps 1 and 2.
  5. Seat the bolts that secure the legs to the Frame, but DO NOT tighten them at this step. The goal is to simply take up the slack in the joint. The legs will be wobbly at this step which is OK. The leg bolts will be tightened at a later step.

3: Install Y-axis rails and carriages

First, complete the assembly of the Y-axis bearing block carriages.

YOU WILL NEED FROM THE HARDWARE BOX Fastener bags 115, 119, 205, 206, 308, 309

3.1 Assemble the Y-axis bearing block carriages

Y-AXIS RAILS
Materials
Parts
  • (2) Carriage Weldment (RH and LH)
  • (4) Bearing Block Assembly
  • (2) X-Axis Chain Tab
  • (1) Chain Tab Weldment
Hardware
  • (16) Bag 115 1/4"-20 x 7/8" Socket Head Cap Screw
  • (16 + 1) Bag 205 1/4" Washer (1 extra for each chain tab hole that does not line up)
  • (16) Bag 308 1/4"-20 Serrated Flange Nut
Tools
  • (1) 3/16" Hex Key
  • (1) 7/16" Wrench

Instructions

  1. Secure one Bearing Block Assembly to each flange of the Carriage Weldment, and one X-Axis Chain Tab to each Carriage Weldment. Orient each Bearing Block Assembly so the set screws are in the location shown. Thread the screws in finger tight only. The adjustable bearing blocks must stay free floating, so do not tighten their socket head cap screws.
  2. Repeat for the second carriage, making sure the X-Axis Chain Tabs face the correct way. Attach the Chain Tab Weldment to the RH Carriage, facing away from the gantry.
  3. Some chain tabs have only 3 mounting holes. At the hole where the chain tab does not overlap, the screw clamps one less layer, so its end sticks out further past the nut and can hit the motor. Add an extra 1/4" Washer under the nut on that screw to take up the space, so the screw end stays clear of the motor.

3.2 Place the Y-axis rails and carriages

Frame Tubes
Materials
Parts
  • (2) Carriage Assembly (RH and LH)
  • (2) Y-Axis Rail
  • (8) Stanchion Plate
  • (1) Chain Tab Weldment
Hardware
  • (16) Bag 119 HEX HEAD CAP SCREW, 3/8-16 X 3
  • (32) Bag 206 WASHER, 3/8"
  • (16) Bag 309 HEX NUT, 3/8"
Tools
  • (2) 9/16” Wrench

3.3 Bolt the Y-axis rails to the stanchions

Stanchions

Instructions

  1. Insert one Y-Axis Rail into each of the Y-Axis Carriage assemblies. The orientation of each Y-Axis Rail is important and must match what is shown in the diagrams.
  2. Secure the Y-Axis Rails to the machine frame assembly using the Stanchion Plates and fasteners shown. Make sure that ¼” diameter holes in the Y-Axis Rail line up to the holes in the Stanchion Plates. If they do not line up, then the Y-Axis Rail is likely installed upside down.
  3. Tighten each of the bolts that secures the Stanchion Plates to both lower rail tubes. DO NOT tighten the bolts that secure the stanchion plates to the Y-Axis Rails. They will be tightened in a later step.
  4. Note: The carriage bearings should be loose on the rails. They will be pre-loaded in a later step.

4: Install gantry and Z-axis

Complete the Z-axis assembly and mount it to the X-axis carriage.

YOU WILL NEED FROM THE HARDWARE BOX Fastener bags 112, 113, 114, 118, 206, 308, 309, 402

4.1 Mount the Z-axis on the X-axis carriage

GANTRY-Z-AXIS
Materials
Parts
  • (1) Z-Axis Assembly
  • (1) Laser Head Plate
  • (1) Thumb Screw
  • (1) X-Axis Carriage Assembly
  • (1) X-Axis Lead Nut Mount
Hardware
  • (2) Bag 112 SOCKET HEAD CAP SCREW, 10-24 X 1/2"
  • (3) Bag 114 SOCKET HEAD CAP SCREW, 1/4-20 X 3/4"
  • (2) SOCKET HEAD CAP SCREW, 1/4-20 X 1½" (pre-installed, not bagged)
Tools
  • 5/32" Hex Key
  • 3/16" Hex Key
  • 7/16" Wrench

Instructions

  1. Secure the Z-Axis Assembly to the X-Axis Carriage using Bag 114 Socket Head Cap Screws. The key protrusion on the back of the Z-Axis Assembly should fit snugly in the shallow slot of the X-Axis Carriage. Fully tighten the screws.
  2. Attach the laser head plate to the Z-Axis Assembly using...
  3. Attach the X-Axis Lead Nut Mount to the X-Axis Carriage Assembly using Bag 112 Socket Head Cap Screws. These screws should be seated fully, but the mount should be able to float.

4.2 Close-up of the gantry mount

Gantry Mount

4.3 Mount the gantry on the Y-axis carriages

Mount the gantry
Materials
Parts
  • (1) Gantry Assembly
  • (2) Y-Axis Carriages (on assembled machine)
Hardware
  • (4) Bag 118 HEX HEAD CAP SCREW, 3/8-16 X 2.75"
  • (4) Bag 309 3/8-16 HEX NUT
  • (4) Bag 206 3/8" WASHER
  • (2) Bag 113 SOCKET HEAD CAP SCREW, 1/4-20 X ½"
  • (2) Bag 308 SERRATED FLANGE NUT, 1/4-20
  • (4) Bag 402 Tube Spacer
Tools
  • (2) 9/16" Wrench
  • 3/16" Hex Key
  • 7/16" Wrench

Instructions

  1. Attach the Gantry Assembly to the Y-Axis Carriages using the fasteners shown. DO NOT tighten these bolts. Note: The Bag 113 socket head cap screws must be passed through the clearance hole in the top of the gantry tube. Consider taping the screw to the hex key to prevent it from dropping into the tube.

5: Y-axis adjustment

Each Y-axis carriage has two bearing block assemblies, each with two fixed and two adjustable bearing blocks. Adjust them so the bearings are preloaded against the Y-axis rails.

5.1 Set the bearing block preload

GANTRY-Z-AXIS
Materials
Parts
  • (8) Assembled Machine Adjustable Bearing Blocks
Hardware
  • None (pre-installed)
Tools
  • 3/16" Hex Key
  • 1/8" Hex Key

Instructions

  1. Each Y-Axis Carriage Assembly includes two Bearing Block Assemblies. Each Bearing Block Assembly contains four bearing blocks; two are fixed and two are adjustable. The goal of this assembly section is to adjust the Adjustable Bearing Block to ensure that the bearings are properly preloaded into the Y-Axis Rails.
  2. On each Adjustable Bearing Block, seat both socket head cap screws and then back them off approximately 1/4 turn. Next, slowly turn the adjustment set screw clockwise. Stop turning the set screw when at least one of the two opposing Fixed Bearing Block Bearings is in contact with the rail and when no play can be felt.
  3. Once Step 2 is complete, tighten the socket head cap screws that secure the Adjustable Bearing Block to the backing plate.
  4. Complete Steps 2 and 3 for each of the eight Adjustable Bearing Blocks that the machine has.

5.2 Tighten the gantry bolts in order

Gantry Mount Order
Materials
Parts
  • (1) Assembled Machine Gantry
Hardware
  • None
Tools
  • (2) 9/16" Wrench
  • 3/16" Hex Key
  • 7/16" Wrench

Instructions

  1. Slide the Gantry Assembly along the Y-Axis Rails until the bearings touch the Stanchion Plates as shown.
  2. Tighten the 6 fasteners that secure the Gantry Tube to the Y-Axis Carriages.
  3. Tighten the 16 cap screws that secure the Bearing Block Assemblies to the Y-Axis Carriages.
  4. Tighten the 8 bolts that secure the Y-Axis Rails to the Stanchion Plates that were left loose in a previous step.
  5. Cycle the Gantry Assembly back and forth along the Y-Axis Rails to make sure that it moves freely. If it does not, repeat previous steps to make the Y-Axis Rails parallel.
  6. Verify there is no lash/play between the rolling carriages and the rails. If there is, repeat Step 3 of the previous instruction set to further pre-load the adjustable.

6: Install caps

Fit the tube caps on the open ends of the frame tubes.

6.1 Fit the tube caps on the frame

Caps
Materials
Parts
  • (18) Tube Cap
  • (1) Cable Support Tube
Hardware
  • None
Tools
  • Mallet

Instructions

  1. Using a mallet, insert Tube Plugs into the open ends of each tube.
  2. Insert the Cable Support Tube into the left hand Y-Axis Rail cable support hole.

7: Install lead screw bearing mounts

Install the Y-axis lead screw bearing mounts.

YOU WILL NEED FROM THE HARDWARE BOX Fastener bags 109, 114, 401

7.1 Install the Y-axis bearing mounts

BEARING MOUNTS
Materials
Parts
  • (2) Y-Axis Lead Screw Bearing Mount
Hardware
  • (4) Bag 109 SOCKET HEAD CAP SCREW, 8-32 X 1/2"
  • (4) Bag 114 SOCKET HEAD CAP SCREW, 1/4-20 X 3/4"
  • (2) Bag 401 608 BALL BEARING
Tools
  • 9/64" Hex Key
  • 3/16" Hex Key

Instructions

  1. Insert the Bag 401 Ball Bearing into the counterbore of the Y-Axis Lead Screw Bearing Mount. Install the two Bag 109 Socket Head Cap Screws to retain the bearing in the counterbore and tighten fully. Note: a C-clamp may needed to insert the bearing into the bearing mount if a press fit condition exists.
  2. Secure the Y-Axis Lead Screw Bearing Mount to the left hand Y-Axis Rail using the two Bag 114 Socket Head Cap Screws and hand tighten only. NOTE: the screws have to be inserted through the mounting holes inside of the Y-Axis Rail Tube. Temporarily removing the ⅜” Stanchion Plate bolt makes it easier to install the screws. Replace the ⅜” stanchion plate bolt when complete.
  3. Repeat Steps 1 and 2 for the other side.

7.2 Install the X-axis lead screw bearing

Frame Tubes
Materials
Parts
  • (1) X-Axis Lead Screw Bearing Mount (previously installed)
Hardware
  • (2) Bag 109 SOCKET HEAD CAP SCREW, 8-32 X 1/2""
  • (1) Bag 401 608 BALL BEARING
Tools
  • 9/64" Hex Key

Instructions

  1. I Insert the Bag 401 Ball Bearing into the counterbore of the X-Axis Lead Screw Bearing Mount. Install the two Bag 109 Socket Head Cap Screws to retain the bearing in the counterbore and tighten fully. Note: a C-clamp may needed to insert the bearing into the bearing mount if a press fit condition exists.

8: Install motor mounts and lead nuts

Install the mounts for the Y-axis stepper motors.

YOU WILL NEED FROM THE HARDWARE BOX Fastener bags 110, 114, 203, 307, 404

8.1 Install the Y-axis motor mounts

MOTOR MOUNTS
Materials
Parts
  • (2) Y-Axis Motor Mount
Hardware
  • (4) Bag 114 SOCKET HEAD CAP SCREW, 1/4-20 X ¾"
Tools
  • 3/16" Hex Key

Instructions

  1. Secure the Y-Axis Motor Mount to the left hand Y-Axis Rail using the Bag 114 Socket Head Cap Screws and hand tighten only. NOTE: the screws have to be inserted through the mounting holes inside of the Y-Axis Rail Tube. Temporarily removing the ⅜” Stanchion Plate bolts makes it easier to install the screws. Replace the ⅜” Stanchion Plate bolt when complete.
  2. Repeat Step 1 for the other side.

8.2 Install the Y-axis lead nuts

motor-mounts-2
Materials
Parts
  • (2) Y-Axis Carriage (on assembled machine)
Hardware
  • (8) Bag 110 SOCKET HEAD CAP SCREW, #8-32 X 3/4"
  • (16) Bag 203 #8 WASHER
  • (8) Bag 307 LOCK NUT, #8-32
  • (2) Bag 404 Y-AXIS LEAD NUT
Tools
  • 9/64" Hex Key
  • 11/32" Wrench

Instructions

  1. Secure the Bag 404 Y-Axis Lead Nut to the lefthand Y-Axis Carriage using the fasteners shown. Do not fully tighten the screws; the Y-Axis Lead Nut must be able to float in all directions for alignment in a later step.
  2. Repeat Step 1 for the other side.

8.3 Install the X-axis lead nut

motor-mounts-3
Materials
Parts
  • (1) X-Axis Lead Nut Mount Tab (on assembled machine)
Hardware
  • (2) Bag 110 SOCKET HEAD CAP SCREW, #8-32 X 3/4"
  • (2) Bag 203 #8 WASHER
  • (2) Bag 307 LOCK NUT, #8-32
  • (1) Bag 404 X-AXIS LEAD NUT
Tools
  • 9/64" Hex Key
  • 11/32" Wrench

Instructions

  1. Secure the Bag 404 X-Axis Lead Nut to the X-Axis Lead Nut Mount Tab using the fasteners shown. Do not fully tighten the screws; the X-Axis Lead Nut must be able to float in all directions for alignment in a later step.

9: Install lead screws

Install both of the Y-axis Lead screws.

YOU WILL NEED FROM THE HARDWARE BOX Fastener bags 111, 204

9.1 Install the Y-axis lead screws

lead screws
Materials
Parts
  • (2) Y-Axis Lead Screw (1/2")
  • (2) Y-Axis Lead Nut (previously installed)
Hardware
  • (2) Bag 111 SOCKET HEAD CAP SCREW, 10-32 X 3/8"
  • (2) Bag 204 #10 WASHER
Tools
  • 5/32" Hex Key

Instructions

  1. Position the Gantry in approximately the center of its travel.
  2. Starting with the end of the that has the tapped hole, screw the Y-Axis Lead Screw into the Y-Axis Lead Nut (make sure to pull back on the White Compression Collar during initial insertion of the lead screw to prevent damage to the lead nut). Continue turning the Y-Axis Lead Screw until it can fit into the bearing that is mounted in the Y-Axis Lead Screw Bearing Mount.
  3. Secure the lead screw to the bearing using the hardware shown and fully tighten.
  4. Repeat Steps 2 and 3 for the other side.

9.2 Install the X-axis lead screw

lead screw 2
Materials
Parts
  • (1) X-Axis Lead Screw (1/2")
  • (1) X-Axis Lead Nut (previously installed)
Hardware
  • (1) Bag 111 SOCKET HEAD CAP SCREW, 10-32 X 3/8"
  • (1) #10 WASHER (comes with the Z-axis, not bagged)
Tools
  • 5/32" Hex Key

Instructions

  1. Position the Gantry in approximately the center of its travel.
  2. Starting with the end of the that has the tapped hole, screw the X-Axis Lead Screw into the X-Axis Lead Nut (make sure to pull back on the White Compression Collar during initial insertion of the lead screw to prevent damage to the lead nut). Continue turning the X-Axis Lead Screw until it can fit into the bearing that is mounted in the X-Axis Lead Screw Bearing Mount.

10: Install motors

Tell the X and Y motors apart before you install them.

The 4x4 Laser uses 3 NEMA-23 closed-loop stepper motors. All 3 motor bodies are identical, so use the cable length to tell them apart:

  • Y-axis motors (2):longer cables, both the same length
  • X-axis motor (1): shorter cable

YOU WILL NEED FROM THE HARDWARE BOX Fastener bags 112, 403

10.1 Install the Y-axis motors

Y-axis motors
Materials
Parts
  • (2) Y-Axis Motor
Hardware
  • (8) Bag 112 SOCKET HEAD CAP SCREW, 10-24 X 1/2"
  • (2) Bag 403 MOTOR COUPLER
Tools
  • 5/32" Hex Key
  • 3/32" Hex Key
  • 3mm Hex Key

Motor Coupler Differentiation

4-Screw Steel Couplers, the installation procedures are the same.

Instructions

  1. Slide the Bag 403 Motor Coupler onto the end of the lefthand Y-Axis Lead Screw until it rests against the shoulder.
  2. There are two Y-Axis Motors,. Secure the Y-Axis Motor to the Y-Axis Motor Mount using the fasteners shown and fully tighten. NOTE: The motor cable should be oriented downward.
  3. Do not tighten the Bag 403 Motor Coupler clamp. They will be tightened in a later step.
  4. Tighten the screws that secure the Y-Axis Motor Mount and the Y-Axis Lead Screw Bearing Mount to the Y-Axis Rail Tube.
  5. Repeat Steps 1-4 for the other side using the Y-Axis Motor.

10.2 Install the X-axis motor

Y-axis motors 2
Materials
Parts
  • (1) X-Axis Motor
Hardware
  • (4) Bag 112 SOCKET HEAD CAP SCREW, 10-24 X 1/2"
  • (2) Bag 403 MOTOR COUPLER
Tools
  • 5/32" Hex Key
  • 3/32" Hex Key
  • 3mm Hex Key

Instructions

  1. Slide the Bag 403 Motor Coupler onto the end of the X-Axis Lead Screw until it rests against the shoulder.
  2. Secure the X-Axis Motor to the X-Axis Motor Mount using the fasteners shown and fully tighten. The X-Axis Motor is identical to the Y-Axis Motor with the short cable. NOTE: The motor cable should be oriented downward.
  3. Tighten the Motor Coupler clamp until the set screws are loosely clamping both the motor shaft and the lead screw stub. The Motor Couplers will be fully tightened in a later step.

11: Install cut bed

Attach the bed side mounts to the frame, then set the cutting bed in place.

  • Y-axis motors (2):longer cables, both the same length
  • X-axis motor (1): shorter cable

YOU WILL NEED FROM THE HARDWARE BOX Fastener bags 104, 116, 125, 202, 206, 305, 309, 310

11.1 Locate the bed and bed side mounts

Cut Bed

11.2 Attach the bed side mounts to the frame

Cut Bed 2

11.3 Check the bed mounts are aligned

Cut Bed 2
Materials
Parts
  • (2) Bed Side Mount
Hardware
  • (14) Bag 125 1/4" x 1" Self-Drilling Screw
Tools
  • (2) C-Clamps or Locking Clamps
  • (1) Tape Measure
  • (1) 3/8" Nut Driver
  • (1) Power Drill

Instructions

  1. Place each Bed Side Mount on top of its frame tube with the narrower flange down on the tube and the tall flange facing the inside of the Cut Bed.
  2. Center each mount on its frame tube. Measure from each end of the mount to the end of the tube and adjust until both measurements are equal.
  3. Clamp each mount to the frame tube with two clamps, one near each end, keeping the clamps clear of the screw holes. Re-check that the mount is still centered after the clamps are tightened.
  4. Using the Power Drill and 3/8" Nut Driver, drive 7 of the 1/4" x 1" Self-Drilling Screws through the narrower flange of each mount into the frame tube, 14 in total. Do not overtighten; the threads in the tube wall can strip. (Note: this takes a significant amount of force, and eye PPE is recommended.)
  5. Remove the clamps.